Nissan Juke Service and Repair Manual : Too much power
Description
CHART 13: TOO MUCH POWER
Diagnosis Procedure
1.CHECK ECM POWER SUPPLY AND GROUND CIRCUIT
Check ECM power supply and ground circuit. Refer to EC-885, "Diagnosis Procedure".
Is the inspection result normal? YES >> GO TO 2.
NO >> Repair or replace harness or connector.
2.CHECK WIRING HARNESS
Visually check the condition of the engine wiring harness.
Is the inspection result normal? YES >> GO TO 3.
NO >> Repair or replace harness or connector.
3.CHECK ENGINE COOLANT TEMPERATURE SENSOR
Check engine coolant temperature sensor. Refer to EC-908, "Component Inspection".
Is the turbocharger correct? Yes >> GO TO 4.
No >> Repair or replace.
4.CHECK TURBOCHARGER
Check that the turbocharger is working properly. Refer to EC-1003, "Diagnosis Procedure".
Is the turbocharger correct? Yes >> GO TO 5.
No >> Repair or replace.
5.CHECK CLUTCH PEDAL POSITION SWITCH
Check clutch pedal position switch.
Is the inspection result normal? YES >> GO TO 6.
NO >> Repair or replace.
6.CHECK VEHICLE SPEED SIGNAL
Check the following component.
• ???ABS actuator and electric unit (control unit)??? [Refer to BRC-24, "CONSULT-III Function". (Without ESP), BRC-131, "CONSULT-III Function". (With ESP)] • Combination meter (Refer to MWI-23, "CONSULT-III Function".) Is the inspection result normal? YES >> GO TO 7.
NO >> Repair or replace.
7.CHECK CAN COMMUNICATION
Perform trouble diagnosis on the CAN communication line using CONSULT-III. Refer to LAN-31, "CAN COMMUNICATION SYSTEM : CAN Communication Signal Chart".
Is the inspection result normal? YES >> GO TO 8.
NO >> Repair or replace harness or connector.
8.CHECK HIGH PRESSURE SUPPLY PUMP (PRESSURE CONTROL VALVE)
Perform the TEST 3: HIGH PRESSURE SUPPLY PUMP (PRESSURE CONTROL VALVE). Refer to EC-868, "Work Procedure [TEST 3: High Pressure Supply Pump (Pressure Control Valve) Check]".
>> GO TO 9.
9.CHECK HIGH PRESSURE SUPPLY PUMP (VOLUMETRIC CONTROL VALVE)
Perform the TEST 4: HIGH PRESSURE SUPPLY PUMP (VOLUMETRIC CONTROL VALVE). Refer to EC- 869, "Work Procedure [TEST 4: High Pressure Supply Pump (Volumetric Control Valve) Check]".
>> GO TO 10.
10.CHECK RAIL HIGH PRESSURE CONTROL CIRCUIT
Perform the TEST 5: RAIL HIGH PRESSURE CONTROL CIRCUIT CHECK. Refer to EC-871, "Work Procedure (TEST 5: Rail High Pressure Regulation Check)".
>> GO TO 11.
11.CHECK MAJOR LEAK IN FUEL INJECTOR/FUEL INJECTORS OPEN
Perform the TEST 6: MAJOR LEAK IN FUEL INJECTOR/FUEL INJECTORS OPEN. Refer to EC-876, "Work Procedure (TEST 6: Fuel Injectors Leak Check)".
>> GO TO 12.
12.CHECK INCORRECT FUEL INJECTION QUANTITY
Perform the TEST 7: INCORRECT FUEL INJECTION QUANTITY. Refer to EC-877, "Work Procedure (TEST 7: Fuel Injection Quantity Check)".
>> INSPECTION END
Loss of power
Description CHART 12: LOSS OF POWER Diagnosis Procedure 1.CHECK FUEL Check that the fuel reservoir is correctly filled and with the right fuel. >> GO TO 2. 2.CHECK FUEL FILTER Check t ...Overspeed at idle speed or on releasing brake
Description CHART 14: OVERSPEED AT IDLE SPEED OR ON RELEASING BRAKE Diagnosis Procedure 1.CHECK ENGINE OIL Check the grade of engine oil. Refer to LU-33, "Inspection". Is the inspecti ...Other materials:
Structure and operation
Transaxle : Cross-Sectional View
1. Converter housing
2. Oil pump
3. Counter drive gear
4. Control valve
5. Oil pan
6. Primary pulley
7. Steel belt
8. Secondary pulley
9. Planetary gear (auxiliary gearbox)
10. Side cover
11. Transaxle case
12. Differential case
13. Final gear ...
Precaution
NOTE:
If any malfunction occurs in the RE0F10A model transaxle, replace the entire
transaxle assembly.
• Before connecting or disconnecting the TCM harness connector,
turn ignition switch OFF and disconnect negative battery
cable. Because battery voltage is applied to TCM even if ignition
swi ...
Wiring diagram
DOOR & LOCK SYSTEM
Wiring Diagram
For connector terminal arrangements, harness layouts, and alphabets in a
(option abbreviation; if not
described in wiring diagram), refer to GI-12, "Connector Information/Explanation
of Option Abbreviation".
...