Nissan Juke Service and Repair Manual : Loss of power

Description

CHART 12: LOSS OF POWER

Diagnosis Procedure

1.CHECK FUEL

Check that the fuel reservoir is correctly filled and with the right fuel.

>> GO TO 2.

2.CHECK FUEL FILTER

Check the correctness of the fuel filter.

Is the fuel filter correct? Yes >> GO TO 3.

No >> Replace the fuel filter with an genuine part.

3.CHECK ENGINE OIL

Check the grade of engine oil. Refer to LU-33, "Inspection".

Is the inspection result normal? YES >> GO TO 4.

NO >> Replace engine oil. Refer to LU-34, "Refilling".

4.CHECK ENGINE OIL LEVEL

Is the engine oil level correct? Yes or No Yes >> GO TO 5.

No >> Top up the oil.

5.CHECK ECM POWER SUPPLY AND GROUND CIRCUIT

Check ECM power supply and ground circuit. Refer to EC-885, "Diagnosis Procedure".

Is the inspection result normal? YES >> GO TO 6.

NO >> Repair or replace harness or connector.

6.CHECK WIRING HARNESS

Visually check the condition of the engine wiring harness.

Is the inspection result normal? YES >> GO TO 7.

NO >> Repair or replace harness or connector.

7.CHECK AIR INTAKE SYSTEM

Check air intake system. Refer to EM-280, "Removal and Installation".

Is the inspection result normal? YES >> GO TO 8.

NO >> Repair or replace.

8.CHECK ELECTRIC THROTTLE CONTROL ACTUATOR

Check electric throttle control actuator. Refer to EC-909, "Diagnosis Procedure".

Is the inspection result normal? YES >> GO TO 9.

NO >> Repair or replace.

9.CHECK MASS AIR FLOW SENSOR

Check mass air flow sensor. Refer to EC-902, "Component Inspection".

Is the inspection result normal? YES >> GO TO 10.

NO >> Repair or replace.

10.CHECK ACCELERATOR PEDAL POSITION SENSOR

Check the accelerator pedal position sensor. Refer to EC-1001, "Component Inspection".

Is the inspection result normal? YES >> GO TO 11.

NO >> Repair or replace.

11.CHECK CLUTCH PEDAL POSITION SWITCH

Check clutch pedal position switch.

Is the inspection result normal? YES >> GO TO 12.

NO >> Repair or replace.

12.CHECK VEHICLE SPEED SIGNAL

Check the following component.

• ???ABS actuator and electric unit (control unit)??? [Refer to BRC-24, "CONSULT-III Function". (Without ESP), BRC-131, "CONSULT-III Function". (With ESP)] • Combination meter (Refer to MWI-23, "CONSULT-III Function".) Is the inspection result normal? YES >> GO TO 13.

NO >> Repair or replace.

13.CHECK TURBOCHARGER

Check that the turbocharger is working properly. Refer to EC-1003, "Diagnosis Procedure".

Is the turbocharger correct? Yes >> GO TO 14.

No >> Repair or replace.

14.CHECK CAN COMMUNICATION

Perform trouble diagnosis on the CAN communication line using CONSULT-III. Refer to LAN-31, "CAN COMMUNICATION SYSTEM : CAN Communication Signal Chart".

Is the inspection result normal? YES >> GO TO 15.

NO >> Repair or replace harness or connector.

15.CHECK EGR SYSTEM

Check EGR system. Refer to EC-954, "Diagnosis Procedure".

Is the inspection result normal? YES >> GO TO 16.

NO >> Repair or replace.

16.CHECK CATALYTIC CONVERTER

Is the catalytic converter clogged or deteriorated? Is the inspection result normal? YES >> GO TO 17.

NO >> Repair or replace.

17.CHECK LOW PRESSURE CIRCUIT

Perform the TEST 1: LOW PRESSURE CIRCUIT CHECK. Refer to EC-867, "Work Procedure (TEST 1: Low Pressure Fuel Supply System Check)".

>> GO TO 18.

18.CHECK INTERNAL FUEL TRANSFER PUMP

Perform the TEST 2: INTERNAL FUEL TRANSFER PUMP CHECK. Refer to EC-868, "Work Procedure (TEST 2: Internal Fuel Transfer Pump Check)".

>> GO TO 19.

19.CHECK HIGH PRESSURE SUPPLY PUMP (PRESSURE CONTROL VALVE)

Perform the TEST 3: HIGH PRESSURE SUPPLY PUMP (PRESSURE CONTROL VALVE). Refer to EC-868, "Work Procedure [TEST 3: High Pressure Supply Pump (Pressure Control Valve) Check]".

>> GO TO 20.

20.CHECK HIGH PRESSURE SUPPLY PUMP (VOLUMETRIC CONTROL VALVE)

Perform the TEST 4: HIGH PRESSURE SUPPLY PUMP (VOLUMETRIC CONTROL VALVE). Refer to EC- 869, "Work Procedure [TEST 4: High Pressure Supply Pump (Volumetric Control Valve) Check]".

>> GO TO 21.

21.CHECK RAIL HIGH PRESSURE CONTROL CIRCUIT

Perform the TEST 5: RAIL HIGH PRESSURE CONTROL CIRCUIT CHECK. Refer to EC-871, "Work Procedure (TEST 5: Rail High Pressure Regulation Check)".

>> GO TO 22.

22.CHECK MAJOR LEAK IN FUEL INJECTOR/FUEL INJECTORS OPEN

Perform the TEST 6: MAJOR LEAK IN FUEL INJECTOR/FUEL INJECTORS OPEN. Refer to EC-876, "Work Procedure (TEST 6: Fuel Injectors Leak Check)".

>> GO TO 23.

23.CHECK INCORRECT FUEL INJECTION QUANTITY

Perform the TEST 7: INCORRECT FUEL INJECTION QUANTITY. Refer to EC-877, "Work Procedure (TEST 7: Fuel Injection Quantity Check)".

>> INSPECTION END

    No engine braking
    Description CHART 11: NO ENGINE BRAKING Diagnosis Procedure 1.CHECK ECM POWER SUPPLY AND GROUND CIRCUIT Check ECM power supply and ground circuit. Refer to EC-885, "Diagnosis Procedure" ...

    Too much power
    Description CHART 13: TOO MUCH POWER Diagnosis Procedure 1.CHECK ECM POWER SUPPLY AND GROUND CIRCUIT Check ECM power supply and ground circuit. Refer to EC-885, "Diagnosis Procedure". ...

    Other materials:

    Hoses
    HOSE REMOVAL AND INSTALLATION • To prevent damage to rubber hose, do not pry off rubber hose with tapered tool or screwdriver. • To reinstall the rubber hose securely, check that hose insertion length and orientation is correct. (If tube is equipped with hose stopper, insert rubber hose into ...

    P1641 thermoplunger control unit
    DTC Logic DTC DETECTION LOGIC Diagnosis Procedure 1.CHECK THERMOPLUNGER CONTROL UNIT POWER SUPPLY CIRCUIT 1. Turn ignition switch OFF. 2. Disconnect thermoplunger control unit harness connector. 3. Check the voltage between thermoplunger control unit harness connector and ground. Is the ...

    General Precautions
    WARNING: When replacing fuel line parts, be sure to observe the following. • Put a “CAUTION: FLAMMABLE” sign in the workshop. • Be sure to work in a well ventilated area and furnish workshop with a CO2 fire extinguisher. • Never smoke while servicing fuel system. Keep open flames and sparks ...