Nissan Juke Service and Repair Manual : CVT control system

Wiring diagram

For connector terminal arrangements, harness layouts, and alphabets in a(option abbreviation; if not
(option abbreviation; if not described in wiring diagram), refer to GI-12, "Connector Information/Explanation of Option Abbreviation".


CVT shift lock system


    CVT shift lock system
    Wiring diagram connector terminal arrangements, harness layouts, and alphabets in a (option abbreviation; if not described in wiring diagram), refer to GI-12, "Connector Information/Explanatio ...

    Other materials:

    B1115 satellite sensor RH
    DTC Logic DTC DETECTION LOGIC DTC CONFIRMATION PROCEDURE 1.CHECK SELF-DIAG RESULT With CONSULT-III 1. Turn ignition switch ON. 2. Perform “Self Diagnostic Result” mode of “AIR BAG” using CONSULT-III. Without CONSULT-III 1. Turn ignition switch ON. 2. Check the air bag warning lamp statu ...

    Front fog lamp circuit
    Component Function Check 1.CHECK FRONT FOG LAMP OPERATION CONSULT-III ACTIVE TEST 1. Select “EXTERNAL LAMPS” of IPDM E/R active test item. 2. With operating the test items, check that the front fog lamp is turned ON. Fog : Front fog lamp ON Off : Front fog lamp OFF Is the measurement normal? ...

    P062f eeprom
    DTC Logic DTC DETECTION LOGIC DTC CONFIRMATION PROCEDURE 1.PREPARATION BEFORE WORK If another "DTC CONFIRMATION PROCEDURE" occurs just before, turn ignition switch OFF and wait for at least 10 seconds, then perform the next test. >> GO TO 2. 2.CHECK DTC DETECTION 1. S ...