Nissan Juke Service and Repair Manual : Precaution Necessary for Steering Wheel Rotation after Battery Disconnect

NOTE

:
• Before removing and installing any control units, first turn the ignition switch to the LOCK position, then disconnect both battery cables.

• After finishing work, confirm that all control unit connectors are connected properly, then re-connect both battery cables.

• Always use CONSULT-III to perform self-diagnosis as a part of each function inspection after finishing work.

If a DTC is detected, perform trouble diagnosis according to self-diagnosis results.

For vehicle with steering lock unit, if the battery is disconnected or discharged, the steering wheel will lock and cannot be turned.

If turning the steering wheel is required with the battery disconnected or discharged, follow the operation procedure below before starting the repair operation.

OPERATION PROCEDURE

1. Connect both battery cables.

NOTE

:
Supply power using jumper cables if battery is discharged.

2. Turn the ignition switch to ACC position. (At this time, the steering lock will be released.)
3. Disconnect both battery cables. The steering lock will remain released with both battery cables disconnected and the steering wheel can be turned.

4. Perform the necessary repair operation.

5. When the repair work is completed, re-connect both battery cables. With the brake pedal released, turn the ignition switch from ACC position to ON position, then to LOCK position. (The steering wheel will lock when the ignition switch is turned to LOCK position.) 6. Perform self-diagnosis check of all control units using CONSULT-III.

    Precaution for Supplemental Restraint System (SRS) "AIR BAG" and "SEAT BELT PRE-TENSIONER"
    The Supplemental Restraint System such as “AIR BAG” and “SEAT BELT PRE-TENSIONER”, used along with a front seat belt, helps to reduce the risk or severity of injury to the driver and front passen ...

    Other materials:

    P2100 electric throttle control function
    DTC Logic DTC DETECTION LOGIC Diagnosis Procedure 1.CHECK GROUND CONNECTION 1. Turn ignition switch OFF and wait at least 4 minutes. 2. Check ground connection E38. Refer to Ground inspection in GI-44, "Circuit Inspection". Is the inspection result normal? YES >> GO TO 2 ...

    Coil spring
    Exploded View 1. Upper rubber seat 2. Coil spring 3. Lower rubber seat 4. Rear suspension beam Removal and Installation REMOVAL 1. Remove tires. Refer to WT-7, "Removal and Installation". 2. Set jack under rear suspension beam. CAUTION: • Never damage the suspension beam wi ...

    Additional service when replacing ECM
    Description When replacing ECM, this procedure must be performed. Work Procedure 1.PERFORM INITIALIZATION OF NATS SYSTEM AND REGISTRATION OF ALL NATS IGNITION KEY IDS Refer to SEC-50, "BCM : Special Repair Requirement" (With intelligent key system), SEC-190, "BCM : Work Proce ...