Nissan Juke Service and Repair Manual : Precaution Necessary for Steering Wheel Rotation after Battery Disconnect

NOTE

:
• Before removing and installing any control units, first turn the ignition switch to the LOCK position, then disconnect both battery cables.

• After finishing work, confirm that all control unit connectors are connected properly, then re-connect both battery cables.

• Always use CONSULT-III to perform self-diagnosis as a part of each function inspection after finishing work.

If a DTC is detected, perform trouble diagnosis according to self-diagnosis results.

For vehicle with steering lock unit, if the battery is disconnected or discharged, the steering wheel will lock and cannot be turned.

If turning the steering wheel is required with the battery disconnected or discharged, follow the operation procedure below before starting the repair operation.

OPERATION PROCEDURE

1. Connect both battery cables.

NOTE

:
Supply power using jumper cables if battery is discharged.

2. Turn the ignition switch to ACC position. (At this time, the steering lock will be released.)
3. Disconnect both battery cables. The steering lock will remain released with both battery cables disconnected and the steering wheel can be turned.

4. Perform the necessary repair operation.

5. When the repair work is completed, re-connect both battery cables. With the brake pedal released, turn the ignition switch from ACC position to ON position, then to LOCK position. (The steering wheel will lock when the ignition switch is turned to LOCK position.) 6. Perform self-diagnosis check of all control units using CONSULT-III.

    Precaution for Supplemental Restraint System (SRS) "AIR BAG" and "SEAT BELT PRE-TENSIONER"
    The Supplemental Restraint System such as “AIR BAG” and “SEAT BELT PRE-TENSIONER”, used along with a front seat belt, helps to reduce the risk or severity of injury to the driver and front passen ...

    Precaution for Procedure without Cowl Top Cover
    When performing the procedure after removing cowl top cover, cover the lower end of windshield with urethane, etc. ...

    Other materials:

    A/C control
    Exploded View 1. Intake door cable 2. Mode door cable 3. A/C control 4. Air mix door cable 5. Intake door lever knob A. To mode door link B. To intake door link C. To air mix door link Removal and Installation REMOVAL 1. Remove A/C finisher. Refer to IP-13, "Removal and Install ...

    P2118 throttle control motor
    DTC Logic DTC DETECTION LOGIC DTC CONFIRMATION PROCEDURE 1.PRECONDITIONING If DTC Confirmation Procedure has been previously conducted, always turn ignition switch OFF and wait at least 10 seconds before conducting the next test. >> GO TO 2. 2.PERFORM DTC CONFIRMATION PROCEDURE ...

    Operation inspection
    Work Procedure The purpose of the operational check is to check that the individual system operates normally. Check condition : Engine running at normal operating temperature. 1.CHECK BLOWER MOTOR 1. Operate fan control dial. 2. Check that fan speed changes. Check operation for all fan speeds ...