Nissan Juke Service and Repair Manual : No or very little acceleration, increase in engine speed

Description

CHART 8: NO OR VERY LITTLE ACCELERATION, INCREASE IN ENGINE SPEED

Diagnosis Procedure

1.CHECK FUEL

Check that the fuel reservoir is correctly filled and with the right fuel.

>> GO TO 2.

2.CHECK ECM POWER SUPPLY AND GROUND CIRCUIT

Check ECM power supply and ground circuit. Refer to EC-885, "Diagnosis Procedure".

Is the inspection result normal? YES >> GO TO 3.

NO >> Repair or replace harness or connector.

3.CHECK WIRING HARNESS

Visually check the condition of the engine wiring harness.

Is the inspection result normal? YES >> GO TO 4.

NO >> Repair or replace harness or connector.

4.CHECK AIR INTAKE SYSTEM

Check air intake system. Refer to EM-280, "Removal and Installation".

Is the inspection result normal? YES >> GO TO 5.

NO >> Repair or replace air intake system.

5.CHECK ELECTRIC THROTTLE CONTROL ACTUATOR

Check electric throttle control actuator. Refer to EC-909, "Diagnosis Procedure".

Is the inspection result normal? YES >> GO TO 6.

NO >> Repair or replace.

6.CHECK MASS AIR FLOW SENSOR

Check mass air flow sensor. Refer to EC-902, "Component Inspection".

Is the inspection result normal? YES >> GO TO 7.

NO >> Repair or replace.

7.CHECK TURBOCHARGER

Check that the turbocharger is working properly. Refer to EC-1003, "Diagnosis Procedure".

Is the turbocharger correct? Yes >> GO TO 8.

No >> Repair or replace.

8.CHECK ACCELERATOR PEDAL POSITION SENSOR

Check the accelerator pedal position sensor. Refer to EC-1001, "Component Inspection".

Is the inspection result normal? YES >> GO TO 9.

NO >> Repair or replace.

9.CHECK EGR SYSTEM Check EGR system. Refer to EC-954, "Diagnosis Procedure".

Is the inspection result normal? YES >> GO TO 10.

NO >> Repair or replace.

10.CHECK CATALYTIC CONVERTER

Is the catalytic converter clogged or deteriorated? Is the inspection result normal? YES >> GO TO 11.

NO >> Repair or replace.

11.CHECK CAN COMMUNICATION

Perform trouble diagnosis on the CAN communication line using CONSULT-III. Refer to LAN-31, "CAN COMMUNICATION SYSTEM : CAN Communication Signal Chart".

Is the inspection result normal? YES >> GO TO 12.

NO >> Repair or replace harness or connector.

12.CHECK LOW PRESSURE CIRCUIT

Perform the TEST 1: LOW PRESSURE CIRCUIT CHECK. Refer to EC-867, "Work Procedure (TEST 1: Low Pressure Fuel Supply System Check)".

>> GO TO 13.

13.CHECK INTERNAL FUEL TRANSFER PUMP

Perform the TEST 2: INTERNAL FUEL TRANSFER PUMP CHECK. Refer to EC-868, "Work Procedure (TEST 2: Internal Fuel Transfer Pump Check)".

>> GO TO 14.

14.CHECK HIGH PRESSURE SUPPLY PUMP (PRESSURE CONTROL VALVE)

Perform the TEST 3: HIGH PRESSURE SUPPLY PUMP (PRESSURE CONTROL VALVE). Refer to EC-868, "Work Procedure [TEST 3: High Pressure Supply Pump (Pressure Control Valve) Check]".

>> GO TO 15.

15.CHECK HIGH PRESSURE SUPPLY PUMP (VOLUMETRIC CONTROL VALVE)

Perform the TEST 4: HIGH PRESSURE SUPPLY PUMP (VOLUMETRIC CONTROL VALVE). Refer to EC- 869, "Work Procedure [TEST 4: High Pressure Supply Pump (Volumetric Control Valve) Check]".

>> GO TO 16.

16.CHECK RAIL HIGH PRESSURE CONTROL CIRCUIT

Perform the TEST 5: RAIL HIGH PRESSURE CONTROL CIRCUIT CHECK. Refer to EC-871, "Work Procedure (TEST 5: Rail High Pressure Regulation Check)".

>> GO TO 17.

17.CHECK MAJOR LEAK IN FUEL INJECTOR/FUEL INJECTORS OPEN

Perform the TEST 6: MAJOR LEAK IN FUEL INJECTOR/FUEL INJECTORS OPEN. Refer to EC-876, "Work Procedure (TEST 6: Fuel Injectors Leak Check)".

>> GO TO 18.

18.CHECK INCORRECT FUEL INJECTION QUANTITY

Perform the TEST 7: INCORRECT FUEL INJECTION QUANTITY. Refer to EC-877, "Work Procedure (TEST 7: Fuel Injection Quantity Check)".

>> INSPECTION END

    Engine stalling
    Description CHART 7: ENGINE STALLING Diagnosis Procedure 1.CHECK FUEL Check that the fuel reservoir is correctly filled and with the right fuel. >> GO TO 2. 2.CHECK ECM POWER SUPPLY AN ...

    Engine bucking
    Description CHART 9: ENGINE BUCKING Diagnosis Procedure 1.CHECK ECM POWER SUPPLY AND GROUND CIRCUIT Check ECM power supply and ground circuit. Refer to EC-885, "Diagnosis Procedure". ...

    Other materials:

    Structure and operation
    Transaxle : Cross-Sectional View 1. Converter housing 2. Oil pump 3. Counter drive gear 4. Control valve 5. Oil pan 6. Primary pulley 7. Steel belt 8. Secondary pulley 9. Planetary gear (auxiliary gearbox) 10. Side cover 11. Transaxle case 12. Differential case 13. Final gear ...

    Front grille
    Exploded View 1. Bumper fascia assembly 2. Front side grille RH 3. Front center grille 4. Emblem 5. Front side grille LH : Pawl Removal and Installation REMOVAL CAUTION: When remove front grilles (1) apply protective tape (A) on the bumper fascia (2) to protect the painted surface fr ...

    Basic inspection
    DIAGNOSIS AND REPAIR WORK FLOW Work Flow DETAILED FLOW 1.OBTAIN INFORMATION ABOUT SYMPTOM Interview the customer to obtain the malfunction information (conditions and environment when the malfunction occurred) as much as possible when the customer brings the vehicle in. >> GO TO 2. ...