Nissan Juke Service and Repair Manual : Main line between ipdm-e and dlc circuit

Diagnosis Procedure

1.CHECK CONNECTOR

1. Turn the ignition switch OFF.

2. Disconnect the battery cable from the negative terminal.

3. Check the following terminals and connectors for damage, bend and loose connection (connector side and harness side).

- Harness connector E105 - Harness connector M77

Is the inspection result normal? YES >> GO TO 2.

NO >> Repair the terminal and connector.

2.CHECK HARNESS CONTINUITY (OPEN CIRCUIT)

1. Disconnect the following harness connectors.

- IPDM E/R
- Harness connectors E105 and M77 2. Check the continuity between the IPDM E/R harness connector and the harness connector.

Is the inspection result normal?


Is the inspection result normal? YES >> GO TO 3.

NO >> Repair the main line between the IPDM E/R and the harness connector E105.

3.CHECK HARNESS CONTINUITY (OPEN CIRCUIT)

Check the continuity between the harness connector and the data link connector.

Is the inspection result normal?


Is the inspection result normal? YES (Present error)>>Check CAN system type decision again.

YES (Past error)>>Error was detected in the main line between the IPDM E/R and the data link connector.

NO >> Repair the main line between the harness connector M77 and the data link connector.

    Malfunction area chart
    Main Line Branch Line Short Circuit ...

    Main line between DLC and A-bag circuit
    Diagnosis Procedure 1.CHECK HARNESS CONTINUITY (OPEN CIRCUIT) 1. Turn the ignition switch OFF. 2. Disconnect the battery cable from the negative terminal. 3. Disconnect the BCM harness connector. ...

    Other materials:

    Road test
    Description DESCRIPTION • The purpose of the test is to determine overall performance of CVT and analyze causes of problems. • The road test consists of the following three parts: 1. “Check Before Engine Is Started” TM-190. 2. “Check at Idle” TM-191. 3. “Cruise Test” TM-192. • Before road ...

    Compressor
    Exploded View REMOVAL 1. High-pressure flexible hose 2. O-ring 3. Compressor 4. O-ring 5. Low-pressure flexible hose A. To condenser B. To evaporator : N·m (kg-m, ft-lb) DISASSEMBLY 1. Compressor unit 2. Field coil 3. Snap ring 4. Pulley assembly 5. Snap ring 6. Shim 7. ...

    Power generation voltage variable control system operation inspection
    Inspection Procedure CAUTION: When performing this inspection, always use a charged battery that has completed the battery inspection. (When the charging rate of the battery is low, the response speed of the voltage change will become slow. This can cause an incorrect inspection.) 1.CHECK ...