Nissan Juke Service and Repair Manual : Inspection
INSPECTION AFTER INSTALLATION
• Check accelerator pedal moves smoothly within the whole operation range when it is fully depressed and released.
• Check accelerator pedal securely returns to the fully released position.
• For the electrical inspection of accelerator pedal position sensor. Refer to following; - MR16DDT: EC-387, "Component Inspection" - HR16DE: EC-749, "Component Inspection" - K9K: EC-1001, "Component Inspection"
CAUTION:
When harness connector of accelerator pedal position sensor is disconnected,
perform “ACCELERATOR
PEDAL RELEASED POSITION LEARNING”. Refer to following;
• MR16DDT: EC-129, "Work Procedure"
• HR15DE: EC-547, "Work Procedure"
• K9K: EC-925, "DTC Logic"
Removal and Installation
REMOVAL 1. Disconnect accelerator pedal position sensor harness connector. 2. Loosen mounting bolts, and remove accelerator pedal assembly. CAUTION: • Never disassemble accelerator pedal assembl ...Clutch
...Other materials:
Structure and operation
Transaxle : Cross-Sectional View
1. Converter housing
2. Oil pump
3. Counter drive gear
4. Control valve
5. Oil pan
6. Primary pulley
7. Steel belt
8. Secondary pulley
9. Planetary gear (auxiliary gearbox)
10. Side cover
11. Transaxle case
12. Differential case
13. Final gear ...
Brake booster
Exploded View
2WD
MR16DDT, HR16DE
1. Master cylinder assembly
2. Vacuum pipe
3. Brake booster
4. Lock nut
5. Clevis
6. Gasket
: N·m (kg-m, ft-lb)
K9K
1. Master cylinder assembly
2. Vacuum pipe
3. Brake booster
4. Lock nut
5. Clevis
6. Gasket
: N·m (kg-m, ft-lb)
4WD
1 ...
S terminal circuit
Description
The output voltage of the alternator is controlled by the IC voltage
regulator at the “S” terminal detecting the
input voltage.
The “S” terminal circuit detects the battery voltage to adjust the alternator
output voltage with the IC voltage
regulator.
Diagnosis Procedure
1.CH ...