Nissan Juke Service and Repair Manual : Engine stand setting

Preparing the engine to be on the stand

Before the engine is mounted on the engine sub-attachment, the engine's electrical harness must be removed and the engine oil drained.

1. Remove the multifunction support.

2. Remove the coolant inlet pipe on the water pump.


2. Remove the coolant inlet pipe on the water pump.

3. Place the rods (A), (X), (Y) on the cylinder block.


3. Place the rods (A), (X), (Y) on the cylinder block.

Cylinder block


    Cylinder block
    Disassembly and Assembly PREPARING USED ENGINE The engine should be cleaned and drained (oil and water). Leave on the used engine or include in the return box: • Oil filter • Oil pressure switc ...

    Other materials:

    Repairing material
    Foam Repair During factory body assembly, foam insulators are installed in certain body panels and locations around the vehicle. Use the following procedure(s) to replace any factory-installed foam insulators. URETHANE FOAM APPLICATIONS Use commercially available Urethane foam for sealant ...

    Squeak and rattle trouble diagnoses
    Work Flow CUSTOMER INTERVIEW Interview the customer if possible, to determine the conditions that exist when the noise occurs. Use the Diagnostic Worksheet during the interview to document the facts and conditions when the noise occurs and any of the customer's comments; refer to DLK-139, &q ...

    B260C steering lock unit
    DTC Logic DTC DETECTION LOGIC DTC CONFIRMATION PROCEDURE 1.PERFORM DTC CONFIRMATION PROCEDURE 1. Shift selector lever to the P position. 2. Press push-button ignition switch under the following condition. - Brake pedal: Not depressed 3. Turn ignition switch ON. 4. Turn ignition switch OFF. ...