Nissan Juke Service and Repair Manual : Engine knock
Description
CHART 16: ENGINE KNOCK
Diagnosis Procedure
1.CHECK ENGINE OIL
Check the grade of engine oil. Refer to LU-33, "Inspection".
Is the inspection result normal? YES >> GO TO 2.
NO >> Replace engine oil. Refer to LU-34, "Refilling".
2.CHECK ENGINE OIL LEVEL
Is the engine oil level correct? Yes or No Yes >> GO TO 3.
No >> Top up the oil.
3.CHECK ECM POWER SUPPLY AND GROUND CIRCUIT
Check ECM power supply and ground circuit. Refer to EC-885, "Diagnosis Procedure".
Is the inspection result normal? YES >> GO TO 4.
NO >> Repair or replace harness or connector.
4.CHECK WIRING HARNESS
Visually check the condition of the engine wiring harness.
Is the inspection result normal? YES >> GO TO 5.
NO >> Repair or replace harness or connector.
5.CHECK AIR INTAKE SYSTEM
Check air intake system. Refer to EM-280, "Removal and Installation".
Is the inspection result normal? YES >> GO TO 6.
NO >> Repair or replace air intake system.
6.CHECK ELECTRIC THROTTLE CONTROL ACTUATOR
Check electric throttle control actuator. Refer to EC-909, "Diagnosis Procedure".
Is the inspection result normal? YES >> GO TO 7.
NO >> Repair or replace.
7.CHECK MASS AIR FLOW SENSOR
Check mass air flow sensor. Refer to EC-902, "Component Inspection".
Is the inspection result normal? YES >> GO TO 8.
NO >> Repair or replace.
8.CHECK CATALYTIC CONVERTER
Is the catalytic converter clogged or deteriorated? Is the inspection result normal? YES >> GO TO 9.
NO >> Repair or replace.
9.CHECK HIGH PRESSURE SUPPLY PUMP (PRESSURE CONTROL VALVE)
Perform the TEST 3: HIGH PRESSURE SUPPLY PUMP (PRESSURE CONTROL VALVE). Refer to EC-868, "Work Procedure [TEST 3: High Pressure Supply Pump (Pressure Control Valve) Check]".
>> GO TO 10.
10.CHECK HIGH PRESSURE SUPPLY PUMP (VOLUMETRIC CONTROL VALVE)
Perform the TEST 4: HIGH PRESSURE SUPPLY PUMP (VOLUMETRIC CONTROL VALVE). Refer to EC- 869, "Work Procedure [TEST 4: High Pressure Supply Pump (Volumetric Control Valve) Check]".
>> GO TO 11.
11.CHECK RAIL HIGH PRESSURE CONTROL CIRCUIT
Perform the TEST 5: RAIL HIGH PRESSURE CONTROL CIRCUIT CHECK. Refer to EC-871, "Work Procedure (TEST 5: Rail High Pressure Regulation Check)".
>> GO TO 12.
12.CHECK MAJOR LEAK IN FUEL INJECTOR/FUEL INJECTORS OPEN
Perform the TEST 6: MAJOR LEAK IN FUEL INJECTOR/FUEL INJECTORS OPEN. Refer to EC-876, "Work Procedure (TEST 6: Fuel Injectors Leak Check)".
>> GO TO 13.
13.CHECK INCORRECT FUEL INJECTION QUANTITY
Perform the TEST 7: INCORRECT FUEL INJECTION QUANTITY. Refer to EC-877, "Work Procedure (TEST 7: Fuel Injection Quantity Check)".
>> INSPECTION END
Excessive consumption
Description
CHART 15:EXCESSIVE CONSUMPTION
Diagnosis Procedure
1.CHECK ECM POWER SUPPLY AND GROUND CIRCUIT
Check ECM power supply and ground circuit. Refer to EC-885, "Diagnosis
Procedure&q ...
Engine overheating
Description
CHART 17: ENGINE OVERHEATING
Diagnosis Procedure
1.CHECK COOLING SYSTEM
Check the cooling system. Refer to CO-60, "Troubleshooting Chart".
Is the inspection result normal? ...
Other materials:
P0014 EVT control
DTC Logic
DTC DETECTION LOGIC
NOTE:
If DTC P0014 is displayed with DTC P0078, first perform trouble diagnosis for
DTC P0078. Refer to EC-
585, "DTC Logic".
DTC CONFIRMATION PROCEDURE
1.PRECONDITIONING
If DTC Confirmation Procedure has been previously conducted, always perform
...
Operation inspection
Work Procedure
The purpose of the operational check is to check that the individual system
operates normally.
Check condition : Engine running at normal operating temperature.
1.CHECK MEMORY FUNCTION
1. Set temperature to 30°C by operating the temperature control dial.
2. Press OFF switch.
3 ...
Rear combination lamp
Exploded View
REMOVAL
1. Grommet
2. Grommet
3. Rear combination lamp
: Clip
: N·m (kg-m, in-lb)
DISASSEMBLY
1. Rear combination lamp housing assembly
2. Back-up lamp bulb
3. Harness connector
4. Rear turn signall lamp bulb
5. Stop/tail lamp bulb
Removal and Installation
CAUTIO ...