Nissan Juke Service and Repair Manual : EGR volume control valve closed position learning

Description

EGR Volume Control Valve Closed Position Learning is an operation to learn the fully closed position of the EGR volume control valve by monitoring the EGR volume control valve control position sensor output signal.

Work Procedure

1.START

1. Turn ignition switch ON.

2. Perform ???EGR ADAPTIVES??? in WORK SUPPORT mode with CONSULT-III.

3. Turn ignition switch OFF and wait at least 30 seconds.

4. Start engine and let it idle.

5. Select ???DATA MONITOR??? mode with CONSULT-III.

6. Check that the ???NEW EGR/V OFFSET??? and ???LAST EGR/V OFSET??? indication.

0.75V < NEW EGR/V OFFSET = LAST EGR/V OFSET < 1.5V

>> END

    Additional service when replacing ECM
    Description When replacing ECM, this procedure must be performed. Work Procedure 1.PRECONDITIONING • Connect a CONSULT-III • Connect a battery charger • Electric load switch is OFF • Wait for t ...

    Throttle valve closed position learning
    Description Throttle Valve Closed Position Learning is an operation to learn the fully closed position of the throttle valve by monitoring the throttle position sensor output signal. It must be pe ...

    Other materials:

    Wiring diagram
    Security control system LHD LHD : Wiring Diagram For connector terminal arrangements, harness layouts, and alphabets in a (option abbreviation; if not described in wiring diagram), refer to GI-12, "Connector Information/Explanation of Option Abbreviation". RHD RHD : Wirin ...

    P1650 starter motor relay 2
    Description ECM controls ON/OFF state of the starter relay, according to the engine and vehicle condition. Models with no Intelligent Key System transmit a control signal directly to IPDM E/R. On the other hand, models with the Intelligent Key System transmit a control signal to IPDM E/R by w ...

    PTC heater control unit connection recognition signal circuit
    Diagnosis Procedure 1.CHECK PTC HEATER CONTROL UNIT CONNECTION RECOGNITION SIGNAL 1. Turn ignition switch ON. 2. Check voltage between combination meter harness connector and ground. Is the inspection result normal? YES >> INSPECTION END NO >> GO TO 2. 2.CHECK PTC HEATER CONTR ...