Nissan Juke Service and Repair Manual : C1164, C1165 CV system

DTC Logic

DTC DETECTION LOGIC

DTC CONFIRMATION PROCEDURE


DTC CONFIRMATION PROCEDURE

1.PRECONDITIONING

If “DTC CONFIRMATION PROCEDURE” has been previously conducted, always turn ignition switch OFF and wait at least 10 seconds before conducting the next test.

>> GO TO 2.

2.CHECK DTC DETECTION

1. Turn the ignition switch OFF to ON.With CONSULT-III.


1. Turn the ignition switch OFF to ON.

2. Perform self-diagnosis for “ABS”.

Is DTC “C1164” or “C1165” detected? YES >> Proceed to BRC-195, "Diagnosis Procedure".

NO >> INSPECTION END

Diagnosis Procedure

1.CHECK CUT VALVE POWER SUPPLY

1. Turn the ignition switch OFF.

2. Disconnect ABS actuator and electric unit (control unit) harness connector.

3. Check voltage between ABS actuator and electric unit (control unit) harness connector and ground.

4. Turn the ignition switch ON.


4. Turn the ignition switch ON.

CAUTION:
Never start engine.

5. Check voltage between ABS actuator and electric unit (control unit) harness connector and ground.

Is the inspection result normal?


Is the inspection result normal? YES >> GO TO 3.

NO >> GO TO 2.

2.CHECK CUT VALVE POWER SUPPLY CIRCUIT

1. Turn the ignition switch OFF.

2. Check 50 A fusible link (I).

3. Check continuity and short circuit between ABS actuator and electric unit (control unit) harness connector terminal (2) and 50 A fusible link (I).

Is the inspection result normal? YES >> Perform trouble diagnosis for battery power supply. Refer to PG-10, "Wiring Diagram - BATTERY POWER SUPPLY -".

NO >> Repair or replace error-detected parts.

3.CHECK CUT VALVE GROUND CIRCUIT

1. Turn the ignition switch OFF.

2. Check continuity between ABS actuator and electric unit (control unit) harness connector and the ground.

Is the inspection result normal?


Is the inspection result normal? YES >> GO TO 4.

NO >> Repair or replace error-detected parts.

4.CHECK TERMINAL

Check ABS actuator and electric unit (control unit) pin terminals for damage or loose connection with harness connector.

Is the inspection result normal? YES >> Replace ABS actuator and electric unit (control unit). Refer to BRC-233, "Removal and Installation".

NO >> Repair or replace error-detected parts.

    C1155 brake fluid level switch
    DTC Logic DTC DETECTION LOGIC DTC CONFIRMATION PROCEDURE 1.PRECONDITIONING If “DTC CONFIRMATION PROCEDURE” has been previously conducted, always turn ignition switch OFF and wait at least 10 ...

    C1166, C1167 SV system
    DTC Logic DTC DETECTION LOGIC DTC CONFIRMATION PROCEDURE 1.PRECONDITIONING If “DTC CONFIRMATION PROCEDURE” has been previously conducted, always turn ignition switch OFF and wait at least 10 ...

    Other materials:

    Camshaft valve clearance
    Valve Clearance CHECKING AND ADJUSTING THE VALVE CLEARANCE 1. Install the tappet. 2. Install the camshaft. 3. Install the camshaft brackets. : 11 N·m (1.1 kg-m, 8 ft-lb) 4. Place the valves of the cylinder concerned at the “end of exhaust - beginning of inlet” position and check the clearance ...

    Light & rain sensor
    Exploded View CAUTION: When the light & rain sensor is removed from windshield, the light & rain sensor cannot be re-used. REMOVAL 1. Light & rain sensor bracket 2. Mirror base 3. Light & rain sensor 4. Inside mirror assembly : Pawl : Do not reuse Removal and Installa ...

    Additional service when replacing transaxle assembly
    Description Perform the following work after the transaxle assembly is replaced. Erasing the calibration data • The TCM acquires calibration data (individual characteristic value) of each solenoid that is stored in the ROM assembly (in the control valve). This enables the TCM to perform accu ...