Nissan Juke Service and Repair Manual : Basic inspection

Wiring diagram
Security control system LHD LHD : Wiring Diagram For connector terminal arrangements, harness layouts, and alphabets in a (option abbreviation; if not described in wiring diagram), refer to GI-1 ...

Diagnosis and repair work flow
Work Flow OVERALL SEQUENCE DETAILED FLOW 1.GET INFORMATION ABOUT SYMPTOM Get detailed information from the customer about the symptom (the condition and the environment when the incident/malf ...

Other materials:

B26F2 ignition relay
DTC Logic DTC DETECTION LOGIC DTC CONFIRMATION PROCEDURE 1.PERFORM DTC CONFIRMATION PROCEDURE 1. Turn ignition switch ON under the following conditions, and wait for 2 seconds or more. CVT models - Selector lever is in the P or N position - Do not depress brake pedal M/T models - Do n ...

C1142 press sensor
DTC Logic DTC DETECTION LOGIC DTC CONFIRMATION PROCEDURE 1.PRECONDITIONING If “DTC CONFIRMATION PROCEDURE” has been previously conducted, always turn ignition switch OFF and wait at least 10 seconds before conducting the next test. >> GO TO 2. 2.CHECK DTC DETECTION With CONSULT ...

MR16DDT : Inspection and Adjustment
INSPECTION Magnetic Switch Check • Before starting to check, disconnect the battery cable from the negative terminal. • Disconnect “M” terminal of starter motor. 1. Continuity test [between “S” terminal (A) and switch body] B : “B” terminal C : “M” terminal • Replace magnetic switch if co ...