Nissan Juke Service and Repair Manual : Meter buzzer circuit

Component Function Check

1.CHECK OPERATION OF METER BUZZER

1. Select “BUZZER” of “BCM” on CONSULT-III.

2. Perform “LIGHT WARN ALM” of “Active Test”.

Does meter buzzer beep? YES >> INSPECTION END

NO >> GO TO 2.

2.CHECK COMBINATION METER INPUT SIGNAL

Select the “Data Monitor” for the “METER/M&A” and check the “BUZZER” monitor value.

BUZZER
Under the condition of buzzer input : On Except above : Off

Is the inspection result normal? YES >> Replace combination meter.

NO >> Replace BCM. Refer to BCS-93, "Removal and Installation" (with Intelligent Key system) or BCS- 161, "Removal and Installation" (without Intelligent Key system).

Diagnosis Procedure

1.CHECK POWER SUPPLY OF COMBINATION METER

Check power supply of combination meter. Refer to WCS-39, "COMBINATION METER : Diagnosis Procedure".

Is the inspection result normal? YES >> INSPECTION END

NO >> Repair power supply circuit of combination meter.

    Power supply and ground circuit
    Combination meter COMBINATION METER : Diagnosis Procedure 1.CHECK FUSE Check for blown fuses. Is the inspection result normal? YES >> GO TO 2. NO >> Be sure to eliminate cause of ...

    Parking brake switch signal circuit
    Diagnosis Procedure 1.CHECK COMBINATION METER INPUT SIGNAL 1. Turn ignition switch ON. 2. Check the voltage between combination meter harness connector and ground. Is the inspection result norma ...

    Other materials:

    Primary speed sensor
    Exploded View 1. Transaxle assembly 2. O-ring 3. Primary speed sensor : Always replace after every disassembly. : N·m (kg-m, in-lb) : Genuine NISSAN CVT Fluid NS-2 Removal and Installation REMOVAL 1. Remove the battery. Refer to PG-124, "Removal and Installation". 2. Remove ...

    P0045, P0047, P0048 TC boost control solenoid valve
    DTC Logic DTC DETECTION LOGIC DTC CONFIRMATION PROCEDURE 1.PRECONDITIONING If DTC Confirmation Procedure has been previously conducted, always perform the following procedure before conducting the next test. 1. Turn ignition switch OFF and wait at least 10 seconds. 2. Turn ignition swit ...

    Combination switch input circuit
    Diagnosis Procedure 1.CHECK INPUT 1 - 5 CIRCUIT FOR OPEN 1. Turn ignition switch OFF. 2. Disconnect BCM and combination switch connectors. 3. Check continuity between BCM harness connector and combination switch harness connector. Does continuity exist? YES >> GO TO 2. NO >> ...